JLG M450 ANSI Service Manual User Manual

Page 142

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-30

– JLG Lift –

3121127

5. After grinding it may be neccesary to help the rivet

out by using a center punch with a hammer.

NOTE: It may be necessary to loosen the fixed end brackets

from the machine in order to twist and pull the track
section enough to disconnect the links.

6. Using a flat head screwdriver between the links,

twist the screwdriver and pull the links apart.

Advertising
This manual is related to the following products: