4.2 UPPER (MAIN) BOOM LIFT CYLINDER

Removal

1. Place the machine on a flat and level surface. Place

the Upper Boom in a horizontal position. Place
Lower and Mid Booms 5 degree above horizontal.
Shut down machine and prop boom.

2. Tag, disconnect and cap the upper boom lift cylinder

hydraulic lines and ports.

3. Remove the hardware securing the cylinder rod

attach pin #1 to the boom. Using a suitable brass
drift, drive out the cylinder rod attach pin #1.

4. Secure the cylinder with suitable slings or supports

as required. Remove the hardware securing the bar-
rel end attach pin #2. Using a suitable brass drift,
drive out the barrel end attach pin #2.

5. Remove the cylinder from the boom and place in a

suitable work area.

Installation

NOTE: Coat I.D. of bushings with specified lubricant prior to

installing pins.

1. Install Lift Cylinder in place using suitable slings or

supports, aligning attach pin mounting holes on
upright.

2. Using a suitable drift, drive the barrel end attach pin

#2 through the mounting holes in the lift cylinder
and upright. Secure in place with pin retaining hard-
ware.

3. Remove cylinder port plugs and hydraulic line caps

and correctly attach lines to cylinder ports.

4. With function speed switch at its slowest setting,

extend the cylinder rod until attach pin hole aligns
with those in boom. Using a suitable drift, drive the
cylinder rod attach pin #1 through the aligned
holes. Secure the pin in place with pin retaining
hardware.

5. Cycle cylinder completely to check for proper func-

tioning. Place boom in stowed position. Check
hydraulic fluid level and adjust accordingly.

4.3 MID BOOM LIFT CYLINDER

Removal

1. Place machine on flat and level surface. Place the

Upper Boom in a horizontal position. Place the Mid
Boom in a 10 degree elevated position. Support
Upper Boom with a prop. Support upright with an
overhead crane.

2. Using slings, restrain the lower lift cylinder.
3. Remove the hardware securing the cylinder rod

attach pin #3 to the boom. Using an appropriate
brass drift, drive out the cylinder rod attach pin #3.

4. Tag, disconnect and cap the lift cylinder hydraulic

lines and ports.

5. Remove the hardware securing the barrel end attach

pin #4 to the boom. Using an appropriate brass
drift, drive out the cylinder barrel pin #4.

6. Carefully remove cylinder from boom. Place in a

suitable work area.

Figure 4-2. Upper Boom Lift Cylinder Removal