SECTION 4 - BOOM & PLATFORM

3121127

– JLG Lift –

4-7

4.6 MID AND LOWER LIFT CYLINDER

BLEEDING PROCEDURE

NOTE: Bleeding procedure should only be necessary if

rebuilding or replacing lift cylinder.

1. Check oil level in the hydraulic oil tank (all booms

must be retracted).

2. Lay an oil drip pan under the rod end port block

(Mid Cylinder) and crack bleeder open from the fit-
ting in the port block.

3. From the platform, turn the speed control knob to

the slow position.

4. Lift up very slowly. This will force any air out of the

circuit. If the lower boom is not extending, turn the
speed control up very slowly until the lower boom
starts to move.

5. Raise the lower boom approximately. 30.5 cm (1

foot), then close bleeder while the boom is still mov-
ing.

6. Lift down all the way.

7. Repeat this procedure until all air has been purged

from the circuit. Re-check the hydraulic oil level.

8. To test, cycle the lower lift function 3-4 times to see if

both cylinders stop at the same time when fully
extended.

4.7 WEAR PADS

1. Shim up wear pads until snug to adjacent surface.
2. Replace wear pads when worn to thickness shown

below.

3. Adjust wear pads as follows:

a. Loosen jam nut on adjustment bolt, turn bolt CW

until wear pad is snug to adjacent surface.

b. After adjustments have been made, tighten the

jam nuts on wear pad bolts.

Figure 4-6. Wear Pad Thickness

Table 4-1.Wear Pad Thickness

Pad

Thickness of

New Pad

Replace When Worn to:

A

0.75"

19 mm

0.375"

9.5 mm

B

0.5"

13 mm

0.3125"

8 mm

C

0.5"

13 mm

0.3125"

8 mm