Installation and Bleeding

After installation of the actuator on the equipment, it is
important that all safety devices such as tie rods or safety
cables are properly reattached.

To purge air from the hydraulic lines, connect them
together to create a closed loop and pump hydraulic fluid
through them. Review the hydraulic schematic to deter-
mine which hydraulic lines to connect. The linear feet and
inside diameter of the hydraulic supply lines together with
pump capacity will determine the amount of pumping time
required to fully purge the hydraulic system.

Bleeding may be necessary if excessive backlash is exhib-
ited after the actuator is connected to the hydraulic sys-
tem. The following steps are recommended when a
minimum of two gallons (8 liters) is purged.

1. Connect a 3/16" inside diameter x 5/16" outside

diameter x 5 foot clear, vinyl drain tube to each of the
two bleed nipples. Secure them with hose clamps.
Place the vinyl tubes in a clean 5-gallon container to
collect the purged oil. The oil can be returned to the
reservoir after this procedure is completed.

2. With an operator in the platform, open both bleed

nipples 1/4 turn. Hydraulically rotate the platform to
the end of rotation (either clockwise or counterclock-
wise), and maintain hydraulic pressure. Oil with
small air bubbles will be seen flowing through the
tubes. Allow a 1/2 gallon of fluid to be purged from
the actuator.

3. Keep the fittings open and rotate the platform in the

opposite direction to the end position. Maintain
hydraulic pressure until an additional 1/4 gallon of
fluid is pumped into the container.

4. Repeat steps 2 & 3. After the last 1/2 gallon is

purged, close both bleed nipples before rotating
away from the end position.