Timing Sequences

• RBS Prestart Sequence

1. Time Delay Engine Start (TDES)

TDES is the period which the RBS waits to verify that
the CTS is valid rather than a transient condition.

2. Time Delay Pre-Heat (TDPH)

TDPH, if enabled, occurs after TDES has elapsed
and the engine temperature is below the factory set
engine preheat temperature setting. The engine pre-
heater will be energized for the factory set preheat
delay period.

• RBS Startup Sequence

3. Crank Time

The RBS will crank for a period up to the crank time
or until the engine starts.

4. Rest Time

If the engine does not successfully start, the RBS will
wait for the rest time before attempting to crank the
engine again.

5. Crank Cycles

The RBS will attempt to start the engine up until the
number of crank cycles is reached. If the RBS does
not start, an Overcrank fault is indicated.

6. Time Delay Bypass (TDBP)

Once the engine starts, TDBP must elapse before
low oil pressure and underspeed shutdowns are
activated. This allows the engine to come up to nor-
mal operating conditions before enabling these
shutdowns are monitored.

• RBS Shutdown Sequence

Once all CTS conditions have been removed, the RBS will
begin the shutdown sequence. If a CTS condition is initi-
ated during the shutdown sequence, the RBS will return to
normal running operation until the CTS is removed.

1. Time Delay Engine Run (TDER)

Once the CTS condition is removed, the TDER
period begins. This period ensures that no further
CTS conditions occur prior to the cooldown period.

2. Time Delay Cooldown (TDC)

Once the TDER period ends, the alternator output is
reduced to a minimal level in order to allow the
engine to cool down for the TDC period. If a CTS is
received during the TDC period, the CTS must last
for at least the TDES period for the RBS to return to
normal running operation.

Table 3-5. RBS Prestart Sequence

CTS (Call to Start)
TDES (Engine Start)
Preheat Delay
RBS Startup Sequence

Table 3-6. RBS Startup Sequence

Crank Time -> Rest Time
(Until Engine Start or # of
Crank Cycles)
TDBP Bypass
Normal Running Operation

Table 3-7. RBS Shutdown Sequence

Remove CTS
TDER Engine Run
TDC Cooldown
Engine Stop