5 supplemental information, Supplemental information -26, Wheel torque chart -26 – JLG 150HAX Operator Manual User Manual

Page 104

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE

6-26

– JLG Lift –

3121213

2. Tighten nuts in the following sequence:

3. The tightening of the nuts should be done in stages. Fol-

lowing the recommended sequence, tighten nuts per
wheel torque chart.

4. Wheel nuts should be torqued after first 50 hours of

operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.

6.5

SUPPLEMENTAL INFORMATION

The following information is provided in accordance with the
requirements of the European Machinery Directive 2006/42/
EC and is only applicable to CE machines.

For electric powered machines, the equivalent continuous A-
Weighted sound pressure level at the work platform is less
than 70dB(A)

For combustion engine powered machines, guaranteed
Sound Power Level (LWA) per European Directive 2000/14/
EC (Noise Emission in the Environment by Equipment for
Use Outdoors) based on test methods in accordance with
Annex III, Part B, Method 1 and 0 of the directive, is 112 dB.

The vibration total value to which the hand-arm system is

subjected does not exceed 2,5 m/s

2

. The highest root mean

square value of weighted acceleration to which the whole

body is subjected does not exceed 0,5 m/s

2

.

Table 6-14. Wheel Torque Chart

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

70 ft. lbs.

(95 Nm)

170 ft. lbs.

(225 Nm)

300 ft. lbs.

(405 Nm)

Advertising