Tower boom sequence, Tower boom sequence -13 – JLG 150HAX Operator Manual User Manual

Page 33

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

3121213

– JLG Lift –

2-13

Tower Boom Sequence

1. Place the machine on level ground and with the tower

boom in the stowed position. Identify the hydraulic valve
switch adjacent to the tower lift cylinder at the bottom
end (rear) of the tower base boom.

2. Visually check the two valves in the turntable to ensure

the plungers are fully extended

.

SIDE VIEW: MAIN BOOM AND
TOWER BOOM ATTACH

TOP VIEW: BOOM ATTACH
TO TURNTABLE

Advertising