JLG 80SL Operator Manual User Manual

Page 61

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121324

– JLG Lift –

4-11

2. While standing on the platform, place the Rail Lowering

Tool on the Rail. (reference the illustration following)

a. Place the Rail Clamp on the underside of the top rail

near the center post.

b. Lower the Tool handle so that the Rubber Stopper

rests on the top of the rail locking the Tool in place
on the rail.

3. Let the Rail Lowering Tool rest on the rail.

4. Attach your fall restraint device to the extension platform

rail - center lanyard attach point before lowering the
main rails.

5. Remove the Rail Corner Pin where the side rail connects

to the end rail. While holding onto the side rail, remove
the Safety Pin and pull out the Corner Pin.

6. While continuing to hold onto the rail, walk back to the

Rail Lowering Tool.

1. Rail Lowering Tool

1. Corner Pin
2. Safety Pin

3. Top View of Side Rail

Advertising