JLG 80SL Operator Manual User Manual
Page 61
SECTION 4 - MACHINE OPERATION
3121324
– JLG Lift –
4-11
2. While standing on the platform, place the Rail Lowering
Tool on the Rail. (reference the illustration following)
a. Place the Rail Clamp on the underside of the top rail
near the center post.
b. Lower the Tool handle so that the Rubber Stopper
rests on the top of the rail locking the Tool in place
on the rail.
3. Let the Rail Lowering Tool rest on the rail.
4. Attach your fall restraint device to the extension platform
rail - center lanyard attach point before lowering the
main rails.
5. Remove the Rail Corner Pin where the side rail connects
to the end rail. While holding onto the side rail, remove
the Safety Pin and pull out the Corner Pin.
6. While continuing to hold onto the rail, walk back to the
Rail Lowering Tool.
1. Rail Lowering Tool
1. Corner Pin
2. Safety Pin
3. Top View of Side Rail