JLG 80SL Operator Manual User Manual
Page 62
SECTION 4 - MACHINE OPERATION
4-12
– JLG Lift –
3121324
7. Tightly grasp the top portion of the rope and begin to
slowly lower the railing using hand-over-hand motions.
FALL HAZARD. EXERCISE EXTREME CAUTION WHEN LOWERING
RAILS, USER SHOULD STAND CLEAR OF THE PLATFORM EDGE AND
MAINTAIN A STABLE FOOTING DURING THE LOWERING PROCEDURE.
NOTE:
The extension side rails, in the upright position, can be
used for extra footing support.
8. When rail is fully lowered, pull the bottom portion of the
rope tight to release the Tool’s Rail Clamp from the
machine.
9. Repeat the previous steps on the opposite side rail and
platform extension end rail.
10. Once the main platform side rails and platform extension
end rail are lowered, secure them in place by inserting
all of the Pins into the lower holes of the Rail/Platform
Attach Brackets.