4 emergency towing, Prior to towing, Emergency towing -6 – JLG 80SL Operator Manual User Manual
Page 72: Prior to towing -6, Drive disconnect hub -6
SECTION 5 - EMERGENCY PROCEDURES
5-6
– JLG Lift –
3121324
5.4
EMERGENCY TOWING
RUNAWAY VEHICLE/MACHINE HAZARD. MACHINE HAS NO TOWING
BRAKES. TOWING VEHICLE MUST BE ABLE TO CONTROL MACHINE AT
ALL TIMES. ON-HIGHWAY TOWING NOT PERMITTED. FAILURE TO FOL-
LOW INSTRUCTIONS COULD CAUSE SERIOUS INJURY OR DEATH.
MAXIMUM TOWING SPEED 5 M.P.H. (8 K.M.H.) FOR NO LONGER THAN
30-45 MINUTES.
MAXIMUM TOWING GRADE 25%.
Prior to Towing
Prior to towing the machine, complete the following:
DO NOT TOW MACHINE WITH ENGINE OPERATING OR DRIVE HUBS
ENGAGED.
1. Completely lower platform.
2. Disconnect drive hubs by inverting disconnect cap.
(See Figure 5-1.) After towing the machine, complete the
following:
a. Reconnect drive hubs by inverting disconnect cap.
1
2
3
Figure 5-1. Drive Disconnect Hub
1. Hub Connected
2. Disconnect Cap
3. Hub Disconnected