3 manual procedures, Manual platform deck retraction, Manual procedures -3 – JLG 80SL Operator Manual User Manual

Page 69: Manual platform deck retraction -3

Advertising
background image

SECTION 5 - EMERGENCY PROCEDURES

3121324

– JLG Lift –

5-3

5.3

MANUAL PROCEDURES

Manual Platform Deck Retraction

NOTE:

The platform deck extension should be retracted before
the platform lowering begins.

1. Locate the valve block and handpump inside the

hydraulic cover on the right side of the machine.

2. Turn valve knob on the manual handpump clockwise

until tight.

NOTE:

Step 2 applies only to machines prior to S/N 1200021263.

3. Locate the lever at the end of the valve bank near the

back. Push lever down to engage valve.

Advertising