Rail raising procedure – JLG 80SL Operator Manual User Manual

Page 64

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-14

– JLG Lift –

3121324

2. Carefully lower rails inward to the platform deck.

3. Secure rails by inserting Main Pins back into brackets

and securing pin with Safety Pins.

Rail Raising Procedure

NOTE:

Follow the Platform Rail Lowering Procedures in reverse
order to raise rails to the working positions. Make certain
to secure all rails with all pins and all safety pins.

WHEN STANDING ON THE MAIN PLATFORM SURFACE LOWERING OR
RAISING THE MAIN PLATFORM RAILS, JLG INDUSTRIES, INC. RECOM-
MENDS THE USE OF A FALL RESTRAINT DEVICE ATTACHED TO THE
CENTER RAIL LANYARD ATTACH POINT ON THE PLATFORM EXTEN-
SION RAIL ADJACENT TO THE MAIN RAIL YOU ARE LOWERING/RAIS-
ING.

1. Safety Pin

2. Main Pin

Advertising