Wheel torque chart -29 – JLG 600A_AJ Operator Manual User Manual

Page 129

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE

3121615

– JLG Lift –

6-29

1.

Start all nuts by hand to prevent cross threading. DO NOT
use a lubricant on threads or nuts.

2.

Tighten nuts in the following sequence:

3.

The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.

4.

Wheel nuts should be torqued after first 50 hours of opera-
tion and after each wheel removal. Check torque every 3
months or 150 hours of operation.

Table 6-17. Wheel Torque Chart

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

40 ft. lbs.

(55 Nm)

95 ft. lbs.

(130 Nm)

170 ft. lbs.

(230 Nm)

Advertising