General -14, General – JLG 600A_AJ Operator Manual User Manual
Page 42
SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
2-14
– JLG Lift –
3121615
General
Begin the "Walk-Around Inspection" at Item 1, as noted on the
diagram. Continue checking each item in sequence for the con-
ditions listed in the following checklist.
TO AVOID POSSIBLE INJURY BE SURE MACHINE POWER IS OFF.
INSPECTION NOTE: On all components, make sure there are no
loose or missing parts, that they are securely fastened, and no visi-
ble damage, leaks or excessive wear exists in addition to any other
criteria mentioned.
1.
Platform Assembly and Gate - Footswitch works properly,
not modified, disabled or blocked. Latch and hinges in
working condition.
2.
Platform & Ground Control Consoles - Switches and levers
return to neutral, decals/placards secure and legible, con-
trol markings legible.
3.
Rotator - See Inspection Note.
4.
Jib (If Equipped) - See Inspection Note.
5.
Power Track - See Inspection Note.
6.
All Hydraulic Cylinders - See Inspection Note.
7.
Drive Motor, Brake, and Hub - See Inspection Note.
8.
Wheel/Tire Assemblies - Properly secured, no missing lug
nuts. Inspect for worn tread, cuts, tears or other discrepan-
cies. Inspect wheels for damage and corrosion.
9.
Tie Rod and Steering Linkage - See Inspection Note.
10.
Turntable Lock - Operable.
Figure 2-6. Daily Walk-Around Inspection Points - Sheet 1 of 2