JLG G6-42A Service Manual User Manual

Page 57

Advertising
background image

3-19

G6-42A, G9-43A, G10-43A

Boom

6. Install the strong back (1) with the previously

removed hardware (2) and torque as required.

7. Align the extend/retract cylinder bore with the strong

back bores and install the extend/retract cylinder pin
(3) and secure with the retaining clips (4).

8. Install anchor rod through front of boom assembly.

9. Connect the extend chain (5) to the anchor rod (6).

10. Install the guide bar (7) and chain retainer (8) to the

front of the push beam with the previously removed
hardware (9).

11. Properly connect the battery.

12. Start the machine and SLOWLY retract the extend/

retract cylinder until the push beam assembly bores
can be aligned with boom sections access bores.

13. Properly disconnect the battery.

14. Install both push beam pins (10) being careful to

align the pin mounting bolt holes.

Note: Disconnecting one or both extend/retract
hydraulic tubes (11) may be required to gain access to
the hose guide mounting bolts. After installing both hose
guides, re-connect one or both extend/retract hydraulic
tubes BEFORE preceding.

15. Install tilt cylinder hose guide (12) and auxiliary hose

guide from rear of third second section.

Note: Note position of belleville washers for reassembly.

MAL1290

4

1

3

4

2

2

2

MY3930

7

5

6

8

9

MAL1290

12

12

10

10

11

11

MAL2660

13

15

14

G6-42A

G9-43A

G10-43A

Advertising
This manual is related to the following products: