Swinging the boom, Raising and lowering the tower boom, Raising and lowering the main boom – JLG 510AJ Series II Operator Manual User Manual

Page 57: Telescoping the main boom, 8 function speed control, 8 function speed control -9

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121292

– JLG Lift –

4-9

TO AVOID SERIOUS INJURY, DO NOT OPERATE MACHINERY IF ANY
CONTROL LEVER OR TOGGLE SWITCH CONTROLLING PLATFORM
MOVEMENT DOES NOT RETURN TO THE ‘OFF’ OR NEUTRAL POSITION
WHEN RELEASED.

TO AVOID A COLLISION AND INJURY IF PLATFORM DOES NOT STOP
WHEN A CONTROL SWITCH OR LEVER IS RELEASED, REMOVE FOOT
FROM FOOTSWITCH OR USE EMERGENCY STOP SWITCH TO STOP THE
MACHINE.

Swinging the Boom

To swing boom, use Main Lift/Swing controller to select
RIGHT or LEFT direction.

Raising and Lowering the Tower Boom

To raise or lower the Tower Boom, use Tower Boom Lift
switch to select UP or DOWN movement.

Raising and Lowering the Main Boom

To raise or lower the Main Boom, use Main Boom Lift switch
to select UP or DOWN movement.

Telescoping the Main Boom

To extend or retract the main boom, use the Main Telescope
Control Switch to select IN or OUT movement.

4.8 FUNCTION SPEED CONTROL

This control affects the speed of all boom functions to the
right of the control and, also, Platform Level. When in the
Counterclockwise maximum position, Drive and all boom
functions are placed in creep speed.

Advertising