18 wheel torque chart -24 – JLG 510AJ Series II Operator Manual User Manual

Page 96

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE

6-24

– JLG Lift –

3121292

2. Tighten nuts in the following sequence:

3. The tightening of the nuts should be done in stages. Fol-

lowing the recommended sequence, tighten nuts per
wheel torque chart.

4. Wheel nuts should be torqued after first 50 hours of

operation and after each wheel removal. Check torque
every 3 months or 150 hours of operation.

Table 6-18. Wheel Torque Chart

TORQUE SEQUENCE

1st Stage

2nd Stage

3rd Stage

40 ft. lbs.

(55 Nm)

100 ft. lbs.

(130 Nm)

170 ft. lbs.

(255 Nm)

Advertising