Wheel torque chart -25 – JLG 740AJ ANSI Operator Manual User Manual
Page 121
Advertising
SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
3121650
– JLG Lift –
6-25
2.
Tighten nuts in the following sequence:
3.
The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.
4.
Wheel nuts should be torqued after first 50 hours of opera-
tion and after each wheel removal. Check torque every 3
months or 150 hours of operation.
Table 6-15. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
3rd Stage
70 ft. lbs.
(95 Nm)
170 ft. lbs.
(225 Nm)
300 ft. lbs.
(405 Nm)
Advertising