JLG 740AJ ANSI Operator Manual User Manual

Page 52

Advertising
background image

SECTION 3 - MACHINE CONTROLS AND INDICATORS

3-6

– JLG Lift –

3121650

NOTE:

Main Lift, Tower Lift, Swing, Platform Level, Main Telescope,
Tower Telescope, Platform Rotate, and Auxiliary Power control
switches are spring-loaded and will automatically return to neu-
tral (off) when released.

WHEN OPERATING THE BOOM ENSURE THERE ARE NO PERSONNEL AROUND OR
UNDER PLATFORM.

TO AVOID SERIOUS INJURY, DO NOT OPERATE MACHINE IF ANY CONTROL LEVERS OR
TOGGLE SWITCHES CONTROLLING PLATFORM MOVEMENT DO NOT RETURN TO THE
OFF POSITION WHEN RELEASED.

8.

Swing Control

Provides 360 degrees continuous
turntable rotation.

9.

Tower Lift

This switch provides raising and low-
ering of the tower boom. This func-
tion works only when the tower
boom is fully retracted.

10.

Main Boom Lift Control

Provides raising and lowering of the
main boom.

11.

Main Telescope Control

Provides extension and retraction of
the main boom.

Advertising