SECTION 4 - MACHINE OPERATION

3121650

– JLG Lift –

4-19

6.

Lower the tower boom fully and con-
tinue to hold down the switch to
Tower Down for an additional 20 sec-
onds.

7.

Repeat steps 3 thru 6 as necessary until the upright is 90°
(vertical) relative to the chassis.

Figure 4-7. Releveling Valve