Daily walk-around inspection (sheet 3 of 3) -8 – JLG 740AJ ANSI Operator Manual User Manual

Page 34

Advertising
background image

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION

2-8

– JLG Lift –

3121650

13.

Fuel Tank - See Inspection Note.

14.

Swing Drive Motor and Brake - See Inspection Note.

15.

Door and Latches - Hood door and latches in working con-
dition, properly secured, no loose or missing parts.

16.

Tie Rod and Steering Linkage - See Inspection Note.

17.

Dual Capacity and Horizontal Cutout Limit Switches if
equipped - Properly secured, no damage to the switches,
arm free to move, and free from dirt and grease.

18.

Battery - Proper electrolyte levels; cables tight, no visible
damage or corrosion.

19.

Hydraulic Pumps - See Inspection Note.

20.

Tower Boom - No visible damage; wear pads secure. All cyl-
inders - rod end pins and barrel-end pins properly secured.

21.

Frame - See Inspection Note.

22.

Main Boom Sections - No visible damage; wear pads
secure. All cylinders - rod end shafts and barrel-end shafts
properly secured.

23.

Upright - In vertical position, relative to the chassis. Refer to
Figure 2-5. and Figure 2-6. If out of alignment, do not use
machine until the upright has been synchronized in accor-
dance with Section 4.16.

Figure 2-4. Daily Walk-Around Inspection (Sheet 3 of 3)

Advertising