AirLive NAS-235 User Manual
Page 14
Advertising
![background image](/manuals/553919/14/background.png)
3. Basic Installation & Setup
9 AirLive NAS-235 User’s Manual
When the self-test is complete, boot up will start. The Ready LED will blink continuously,
and the LAN LED will blink occasionally. Boot up should take approximately 1-3
minutes.
7. Boot up completed.
When the Ready LED stops blinking, and remains on, boot up is complete. If the Status
(Orange) LED stays on, or if the NAS repeatedly beeps, there is a hardware problem.
Consult the Troubleshooting section of this User Guide for possible solutions
Shutdown
To shutdown the NAS, press the power switch to start the shutdown sequence. Wait for all
LEDs to turn off.
Advertising