Wiring the pg10, Battery replacement, 8_pin connector wiring – APG PG10 user manual User Manual

Page 37

Advertising
background image

Rev. B, 6/11

PG10

37

Automation Products Group, Inc.

APG...Providing tailored solutions for measurement applications

Tel: 1/888/525-7300 • Fax: 1/435/753-7490 • www.apgsensors.com • [email protected]

Wiring the PG10

Battery Replacement:

Step 1: Untwist the display locking ring (on the face of the gauge) counter-

clockwise until the ring releases the display from the gauge.

Step 2: Remove the front display to access the batteries.

Step 3: Replace the front display ensuring proper alignment and secure into

place using the locking ring.

3

5

2

8

6

4

7

1

8_Pin Connector Wiring:

PG10 Pin Out Table

L1

L2

L4-C2

4-20 mA

0-2 VDC

with Battery

Power

Power

2 SS Relays

with External

Power

8 Pin Connector

1

+ Excitation

n/a

+ Excitation

2

- Excitation

+ Output

- Excitation

3

n/a

- Output

4

n/a

n/a

5

n/a

n/a

6
7
8

n/a

n/a

L4-C4

2 SPDT Relays

with External

Power

+ Excitation

- Excitation

Relay 1 Com*

Relay 1 NC*

Relay 1 NO*

Relay 2 Com*

L5

RS-485

with External

Power

+ Excitation

- Excitation

SS Relay 1*
SS Relay 1*
SS Relay 2*
SS Relay 2*

*Optional (C2 or C4) relay outputs

n/a indicates not applicable.

L3

0-5 VDC

with External

+ Excitation

+ Output

- Excitation

n/a

n/a

n/a

n/a

Relay 2 NC*

Relay 2 NO*

RS-485 (A)

RS-485 (B)

SS Relay 1*
SS Relay 1*
SS Relay 2*
SS Relay 2*

n/a

n/a

SS Relay 1*
SS Relay 1*
SS Relay 2*
SS Relay 2*

- Output

Advertising