4 electrical installation – Garland SH DU IN 10000 (2x5000 / 10kW) INDUCTION BUILT-IN LINE DUAL-ZONE COOKERS User Manual

Page 15

Advertising
background image

Installation

RTCSmp

Induction

Built-In Line Dual Zone Cookers


Part # 4532285 Rev 4 (4/29/14)

15

4.4

Electrical Installation

IMPORTANT

 Refer to the electrical specifications in chapter 3 Dimensions and Technical Specifications AND the

markings/instruction labels on the unit. If the information differs between the data listed in the
manual and the markings on the unit, always follow the markings on the unit.

 Ensure the supply voltage and the line current match the specifications given on the rating plate. A

stable mains supply must be provided.

CAUTION

Wrong voltage will damage the induction unit. Follow
strictly the specifications on the rating plate.

 The electrical connections must satisfy the national and local electrical codes.
 If ground fault current protective switches are used, they must be provided with selective activation and

designed for a minimum fault current of 30mA. Multiple generators with a mains connection must not be
connected to a single fault current protective switch.

To setup the unit for operation:

1. Ensure the control knob is at the 0 (OFF) position.

ON-Position
Any position where
“0” is not pointing to
the LED light. The
light is on.

OFF-Position
“0” is pointing to the
LED light. The light is
off.

2. Remove all objects from the glass-top and check that the glass-top is neither cracked nor broken.

CAUTION

Do not continue if the glass-top is cracked or broken.
Contact an authorized service agency for assistance.

3. Connecting the components:

A. Use the RJ-45 cables provided to connect the

control units to the built-in induction
generator. The black solid circle on the sticker
indicates the active zone.

B. The control unit connected to the LEFT

connector will control the FRONT heating
zone.

C. The control unit connected to the RIGHT

connector will control the REAR heating zone.

D. Connect the generator to an electrical power

cable (G, LI, L2, L3).

4. Connect the unit to the power supply.

5. After the installation is complete, perform the Function Test. See chapter 5 Function Test.

A

B

C

D

FRONT

FRONT

Advertising
This manual is related to the following products: