3 auspacken und aufstellen, Unpacking and installation, Instrument setup – Leica Biosystems EG1150 C User Manual

Page 13: 3 unpacking and installation

Advertising
background image

13

Leica EG1150 C

4. Instrument Setup

4.3 Unpacking and installation

The unpacking instructions are located on the outside of the transport box in which the

instrument is delivered shows the assembly of the original packaging.

The numbers indicate the sequence of disassembling and reassembling.

When the instrument is delivered, check the tilt indicators on

the packaging.

If the arrowhead is blue, the shipment was transported laying

flat, was tilted at too great an angle or fell over during transport.

Note this on the shipping documents and check the shipment

for possible damage.

Fig.

4

1

2

3

4

6

5

3

6

1. Remove and lift off 8x screws (1) for the

lid (2).

2. Remove upper pad (3).
3. Remove the accessories (4).

These unpacking instructions

only apply if the box is placed
with the symbols

facing

upwards for unpacking.

The Leica EG1150 C always has

to be transported upright and

horizontally. It must not be in-

verted under any circumstances,

even for short periods, or stored

on one of its sides.
It is mandatory to observe a

waiting time of 4 hours between

the last transport and the first

time the instrument is switched

on. The compressor oil moved

during transport must be able

to flow completely back into its

original position.

Advertising