3electrical installation – Lenze E94AYAE SM301 User Manual

Page 30

Advertising
background image

3

Electrical installation

EDK94AYAE DE/EN/FR/ES/IT 3.0

30

l

H1_E_INST−−−−(DUMMYSEITEVOR)−−−

Terminal assignment

)

Note!

Provide for a sufficient strain relief, so that the terminals are not pulled from
the plug connectors, in particular when you use rigid cables.

X82.1

Labelling

Description

This part of the terminal strip is not assigned.

GO

GND SD−Out1

O1B

Safe monitor SD−Out1, channel B

O1A

Safe monitor SD−Out1, channel A

This part of the terminal strip is not assigned.

X82.2

Labelling

Description

GND external supply

+

+24 V external supply via a safely separated power supply unit
(SELV/PELV)

GIR

This part of the terminal strip is reserved.

RI1

GO

GND 24O

24O

+24 V external supply for the safe monitor SD−Out1 (SELV/PELV)

AIE

Error acknowledgement input ("Acknowledge In Error")

CLA

Clock output for passive sensors, channel A (Clock A)

CLB

Clock output for passive sensors, channel B (Clock B)

Advertising