3electrical installation – Lenze E94AYAE SM301 User Manual
Page 30
Electrical installation
EDK94AYAE DE/EN/FR/ES/IT 3.0
30
l
H1_E_INST−−−−(DUMMYSEITEVOR)−−−
Terminal assignment
)
Note!
Provide for a sufficient strain relief, so that the terminals are not pulled from
the plug connectors, in particular when you use rigid cables.
X82.1
Labelling
Description
This part of the terminal strip is not assigned.
GO
GND SD−Out1
O1B
Safe monitor SD−Out1, channel B
O1A
Safe monitor SD−Out1, channel A
This part of the terminal strip is not assigned.
X82.2
Labelling
Description
−
GND external supply
+
+24 V external supply via a safely separated power supply unit
(SELV/PELV)
GIR
This part of the terminal strip is reserved.
RI1
GO
GND 24O
24O
+24 V external supply for the safe monitor SD−Out1 (SELV/PELV)
AIE
Error acknowledgement input ("Acknowledge In Error")
CLA
Clock output for passive sensors, channel A (Clock A)
CLB
Clock output for passive sensors, channel B (Clock B)