6 commissioning and operation, 1 before switching on, 2 during operation – Lenze GPA servo planetary geared motors User Manual
Page 16: Commissioning and operation
Advertising
![background image](/manuals/565839/16/background.png)
Commissioning
Before switching on
6
16
BA 12.0030 EN 2.0
6
Commissioning and operation
Stop!
The drive may only be commissioned by skilled personnel!
6.1
Before switching on
Check:
ƒ Is the mechanical fixing o.k.?
ƒ Are the electrical connections o.k.?
ƒ Are all rotating parts and surfaces, which may become hot, protected against
contact?
6.2
During operation
ƒ During operation, check the drive periodically and take special care of:
– unusual noises or temperatures,
– leakages,
– loose fixing elements,
– the condition of the electrical cables.
ƒ If any interference should occur, proceed according to the troubleshooting list in
chapter 8. If the interference cannot be eliminated, please contact the Lenze Service.