Electrical installation – Lenze E82ZAFPC010 User Manual

Page 55

Advertising
background image

Electrical installation

Wiring to a host

6

EDK82ZAFPC-010 DE/EN/FR 6.0

55

H2 VerdrahtLeitrechner-PBS_leitungsspezifikation

The connection of the PROFIBUS bus system is shown in the general layout drawing.

8200 vector

+

E82ZAFPC010

8200 vector

+

E82ZAFPC010

8200 vector

+

E82ZAFPC010

3

3

3

1

2

2

2

0 m

1200 m

E82ZAFP005

Fig. 1

Example: PROFIBUS with RS485 wiring (without repeater)

No.

Element

Note

1

Host

E.g. PC or PLC with PROFIBUS master interface module

2

Bus cable

Connects the PROFIBUS master interface module to the function
modules.

The baud rate depends on the length of the bus cable (57).

3

PROFIBUS slave

Applicable standard device (45)with function module

Activate bus terminating resistors at the first and last physical
node (68).

Note!

When using a repeater, max. 125 nodes can communicate via the PROFIBUS.

Advertising