7 commissioning, Before switching on, Commissioning – Lenze E82ZAFPC010 User Manual

Page 63

Advertising
background image

Commissioning

Before switching on

7

EDK82ZAFPC-010 DE/EN/FR 6.0

63

H1inbet-bevor

7

Commissioning

Before switching on

Stop!

Before switching on the standard device with the function module for the first
time, check...

ƒ

the entire wiring for completeness, short circuit, and earth fault.

ƒ

whether the integrated bus terminating resistor is activated at the first
and last physical node (68).

Advertising