3 mechanical installation, 1 attaching operating unit, Mechanical installation – Lenze EPM-H515 User Manual
Page 61: Attaching operating unit, 3mechanical installation, Tighten the screws against the mounting board
Advertising
![background image](/manuals/566186/61/background.png)
Mechanical installation
Attaching operating unit
3
61
EDBPM-H515 DE/EN/FR 2.0
3
Mechanical installation
3.1
Attaching operating unit
The dimensions for the mounting cutout can be found in the ”Technical data”
(Q 60).
1. Insert operating unit with gasket into the
mounting cutout.
1
0
H515_005
2. Insert mounting clamps into the slots at the
operating unit.
Input
Vo
ltage
18-32
VDC
15
W
FUSE
1,25
A
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
1
2
3
4
2
2
h515_006
3. Tighten the screws against the mounting
board.
Inpu
t V
olta
ge
18
-32
VD
C 1
5 W
FU
SE
1,2
5 A
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
1
2
3
4
3
3
h515_007
Advertising