3 mechanical installation, 1 attaching operating unit, Mechanical installation – Lenze EPM-H515 User Manual

Page 61: Attaching operating unit, 3mechanical installation, Tighten the screws  against the mounting board

Advertising
background image

Mechanical installation

Attaching operating unit

3



61

EDBPM-H515 DE/EN/FR 2.0

3

Mechanical installation

3.1

Attaching operating unit
The dimensions for the mounting cutout can be found in the ”Technical data”

(Q 60).

1. Insert operating unit  with gasket  into the

mounting cutout.

1

0

H515_005

2. Insert mounting clamps  into the slots at the

operating unit.

Input

Vo

ltage

18-32

VDC

15

W

FUSE

1,25

A

N.C.

CAN+

Shield

CAN-

V-

1

2

3

4

5

1

2

3

4

2

2

h515_006

3. Tighten the screws  against the mounting

board.

Inpu

t V

olta

ge

18

-32

VD

C 1

5 W

FU

SE

1,2

5 A

N.C.

CAN+

Shield

CAN-

V-

1

2

3

4

5

1

2

3

4

3

3

h515_007

Advertising