5 commissioning, 1 first switch-on, Commissioning – Lenze EPM-H515 User Manual

Page 66: First switch-on

Advertising
background image

Commissioning

First switch-on

5



66

EDBPM-H515 DE/EN/FR 2.0

5

Commissioning

5.1

First switch-on
Commissioning requires a complete wiring of the system bus.
Before switching on the supply voltage, check ...

ƒ

the complete wiring for completeness and short circuit,

ƒ

whether the bus system is terminated at the first and last physical node.