3 mechanical installation, 1 attaching operating unit, Mechanical installation – Lenze EPM-H521 User Manual
Page 62: Attaching operating unit, 3mechanical installation, Tighten the screws against the mounting board
Advertising
![background image](/manuals/566217/62/background.png)
Mechanical installation
Attaching operating unit
3
62
EDBPM-H521 DE/EN/FR 2.0
3
Mechanical installation
3.1
Attaching operating unit
The dimensions for the mounting cutout can be found in the ”Technical data”
(Q 61)
1. Insert operating unit with seal into the
mounting cut-out.
1
0
H521_005
2. Insert the fixing clamps into the slots of the
operating unit.
Inpu
t V
oltag
e 18
-32
VD
C 15
W
FU
SE
1,25
A
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
1
2
3
4
2
2
2
2
h521_006
3. Tighten the screws against the mounting
board.
3
3
Inp
ut V
olta
ge
18-3
2 V
DC
15
W
FU
SE
1,2
5 A
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
1
2
3
4
3
3
h521_007
Advertising