2 project transfer to the operating unit, 1 connecting operating unit and pc, Project transfer to the operating unit – Lenze EPM-H521 User Manual
Page 68: Connecting operating unit and pc, Commissioning, Stop
Advertising
![background image](/manuals/566217/68/background.png)
Commissioning
Project transfer to the operating unit
Connecting operating unit and PC
5
68
EDBPM-H521 DE/EN/FR 2.0
5.2
Project transfer to the operating unit
5.2.1
Connecting operating unit and PC
Stop!
Only connect PC and operating unit when the units are switched off!
l
HMI Designer
0
1
INPUT VOLTAGE: 18-32 VDC 15 W
FUSE 1.25 A
MSP
LPT
N.C.
CAN+
Shield
CAN-
V-
1 2 3 4 5
24VDC
+
-
1
2
3
4
1
2
3
4
N.C.
h521_012
Fig.5-1
Connecting operating unit and PC
ƒ
EPZ-H110 download cable on the MSP interface at the operating unit and
COM1 or COMx on the PC