MK Diamond MK-EZ Profile Milling Machine User Manual

Page 21

Advertising
background image

21

MK-EZ

PROFILER

SETUP

WATER PUMP SETUP FOR OPERATION
The Water Pump can be setup for operation in two ways: External Water Source or Re-circulation.

If cutting dry DO NOT connect the water pump.

NOTE:

NOTE: When using the re-circulation method, the water should be changed often for longer pump life.

RE-CIRCULATION

(A)

Ensure the Drain Plug is

installed in the Water Basin

(B)

Place the Water Pump in the

back of the Water Basin

1. Before powering or starting, check for damage that could prevent this equipment

from proper operation or performing it’s intended function. Check for binding and

alignment of moving parts. Check for damaged, broken, or missing parts.

2. Verify the On/Off switch is in the OFF position.

3. Before connecting the MK-EZ Profiler to a power supply, be sure the voltage, cycle

and phase of the job site power source meet the requirements.

CAUTION

PRE-START INSPECTION

Prior to beginning work, a pre-start inspection of the machine should be performed.

Advertising