Unpacking the Load Frame

Series 311 Load Frame

Installation

37

6. Place the load frame onto the isolation pads.

Install stock metal shims between the pads and the floor.

7. Clean the columns.

Some load frame columns are wrapped with protective paper. Remove the
paper as needed. All load frame columns are covered with a protective
grease. Remove the grease using a grade #1 kerosene, mineral spirits, or
equivalent petroleum-based solvent. Ensure adequate ventilation when
cleaning the columns, see the solvent container for additional warnings and
cautions.

8. Remove the chains.

Load Unit

Install

Shims

to Level

Floor

Isolation Pads