MTS Series 311 Load Frame User Manual

Page 58

Advertising
background image

Series 311 Load Frame

58

Bleeding the Hydraulic Lift Cylinders

Maintenance

7. Briefly turn the lift control to lift the crosshead position so the lift cylinders

pressurize. Then return it to the stop crosshead position.

Close When Bubble-Free

8. Shut the bleed port when bubble-free fluid begins oozing out. If necessary,

again pressurize the lift cylinders to force all the air out.

9. Repeat Step 6 through Step 8 to bleed the air out of the other lift cylinder.

Note

If fluid continues to leak out of a shut bleed port, turn off hydraulic
pressure to the load frame. Let the pressure in the lift cylinders return to
zero. Then replace both bleed port screws (MTS part number
010-037-601).

10. Turn on high hydraulic pressure. If pressure was reduced at the hydraulic

power unit, restore full pressure.

11. Briefly turn the Lift Control to the lift crosshead position to pressurize the

lift cylinders. Then return it to the stop crosshead position.

12. Unlock the crosshead and exercise the crosshead. Then return to the stop

crosshead position. Raise and lower the crosshead to check for smooth
operation. Lock the crosshead.

13. If the crosshead does not move smoothly, go back to Step 4 and continue

from there.

Advertising