MTS Series 311 Load Frame User Manual

Page 50

Advertising
background image

Series 311 Load Frame

50

Routine Maintenance Overview Checklist

Maintenance

E-Stop is Working if Applicable

MTS

MTS

MTS

MTS

Response to Full Stroke Waveform,
Visual and Audible

MTS

MTS

MTS

MTS

Valve Balance check displacement
control

MTS

MTS

MTS

MTS

Valve Dither Response

MTS

MTS

MTS

MTS

Grips

Cursory Check of Grips/Grip Control

MTS

MTS

MTS

MTS

Grip Supply Connections are Dry

MTS

MTS

MTS

MTS

Grip Seals are Dry

MTS

MTS

MTS

MTS

Grip Action is Acceptable

MTS

MTS

MTS

MTS

Lubricate Grip Inserts

MTS

MTS

MTS

MTS

*Symbol denotes services performed by equipment operators. Most of these procedures involve visual checks
that should not interfere with test system operation. These checks are also completed by trained field service
engineers on each Routine Maintenance visit.

†Symbol denotes service performed by trained field service engineers as part of an MTS Routine Maintenance
plan. Some of these procedures require special service tools and/or specific service training to complete.

Recommended service to be performed at each running time interval noted

Calendar Time using 8 hour Running Time
rate per day

Daily Weekly

Biweekly

Annually

Running Time-Hours

8

40

80

500

1000

1,500 2,000

Advertising