MTS Multipurpose Elite User Manual
Page 53
![background image](/manuals/568037/53/background.png)
Test Procedure with New Input Variables Activity
3. In the Properties panel, enter the following as necessary:
Input Variables Activity Properties
Value
Property
Enter Relative Cycle End Levels
Display Name
Enter End Level 1 and End Level 2 values for the
Cycle activity, then click OK.
Message
Variable List
Note:
Click the plus sign and use the Variable
Selection window to add variables.
End Level 1, End Level 2
None
Rules
Disabled
Add Cancel Button
5.2.11.0 Adding Parallel Paths and a Data Acquisition Activity
Use this task to add parallel paths to the procedure. Parallel paths allow concurrent test activities, which in
this task are the Cycle and Data Acquisition activities. For this exercise, you move the existing Cycle activity
within the parallel path, add a Data Acquisition activity, and designate the terminal path. The terminal path
determines when all other paths terminate. During the test, the parallel paths definition causes the test to
acquire data when the Cycle activity starts running.
Multipurpose Elite Test Design Guide 53
5.0 Creating Tests