0 running the test procedure – MTS Multipurpose Elite User Manual

Page 56

Advertising
background image

Value

Property

Buffer Size

Note:

Click the Advanced button to set the
buffer size.

100 count

5.2.12.0 Running the Test Procedure

In this task, run the completed test procedure.

1. Ensure that the station has power by setting the HPU to high. If an interlock indicator is lit on the Power

panel, click Reset. Next, click the Low and then High buttons on the HSM.

2. Click the New Test Run icon in the tool bar.

3. In the Specimen Selection window, note the generic specimen selection and click OK.

4. Observe the Setup Variables window, and then click OK.

5. Observe the MTS TestSuite Input Variables window. For End Level 1, enter 3 mm. For End Level 2,

enter -1 mm. When you are finished, click OK.

6. To start the test, click the Run button (green arrow) on the Program control panel.

7. Observe the test run on the Signal Scope. The signal trace ramps to a mean level of 4 mm, performs five

cycles with a true sine waveshape to end levels of 7 mm and 3 mm, and returns to zero.

8. Make additional changes to the test and run as desired.

9. Turn off power to the HSM and HPU, then exit the MPE and Station Manager applications.

56 Multipurpose Elite Test Design Guide

5.0 Creating Tests

Advertising