Bunn C User Manual

Page 19

Advertising
background image

Page 19

SERVICE (cont.)
TANK HEATER SWITCH (cont.)

FIG. 19-1 TANK HEATER SWITCH TERMINALS

15. Set tank assembly inside the hood on mounting

brackets and secure with two #8-32 screws.

16. Reconnect the wires to the limit thermostat, tank

heater and the control thermostat. Refer to limit

thermostat, tank heater and control thermostat sec-

tions in this manual when reconnecting wires.

17. Brewers with faucet reinstall the faucet tube and

reconnect the water supply tube to the coil as-

sembly.

18. Secure the sprayhead tube to the hood using hex

nut.

19. Install sprayhead.

20. Install fill basin, inlet gasket and secure to tank lid

with tank inlet fitting.

21. Carefully install water fill tube into the back of

the fill basin.

22. Reconnect and turn on the incoming water sup-

ply.

23. Refer to Fig. 15 when reconnecting the wires.

BLK to Limit Thermostat

BLK to Terminal Block

(Black Insert)

41711.1 052009

Advertising