Bunn C User Manual

Page 20

Advertising
background image

Page 20

Location:

The thermal cut-off (TCO) is a thermal fuse located

above the tank lid, connected to the tank heater.

NOTE: Installed only on tanks with coil faucet.

CE models have an additional TCO connected to the

other heater terminal.

Test Procedures:

1. Disconnect the brewer from the power source.

2. Disconnect both ends of the TCO.

3. Check for continuity across TCO with an ohm-

meter.

If continuity is present as described, the TCO is op-

erating properly.

If continuity is not present as described, replace the

TCO.

THERMAL CUT-OFF (Brewers W/Faucet)

Fig. 20-1 THERMAL CUT-OFF

FIG. 20-3 TCO TERMINALS

SERVICE (cont.)

Removal and Replacement:

1. Disconnect both ends of the TCO.

2. Install new thermal cut-off.

3. Refer to Fig. 17 when reconnecting wires.

Thermal Cut-Off from Tank

Heater to BLK Lead from

Control Thermostat

WHI or RED to

Terminal Block

FIG. 20-4 TCO TERMINALS

Thermal Cut-Off from Tank

Heater to BLK Lead from

Control Thermostat

RED to

Heater Switch

120V, 120/240V

230V CE

FIG. 20-2 TESTING TCO

41711.1 052009

Advertising