Schwank builderSchwank S100U User Manual

Page 49

Advertising
background image

49

S100-F / ITB-F I&O Manual

IM101230

RD: SEP 2014

RL: 11A

25A. TURBULATOR LENGTH & LOCATION IN SYSTEM: S100 / ITB - Straight Tube

NOTE: Improper location of a turbulator can cause malfunction of the heater,
property damage, and will void the heater warranty.

Tubes with turbulators are clearly labeled for easy identification. Models with as-
terisk refer to notes below the table.

* 60,000 / 80,000 x 30’: Remove 5 ft section of turbulator from the aluminized steel tube (2nd in

system); install 8’ turbulator tube at the vent end of the system

** 110 / 125 / 150 x 50’ & 150 x 60’: Install tube with 2 ft turbulator as 3rd tube in the system

*** 200,000 x 60 ft & 70’: Remove short piece of turbulator from the upstream end of turbulator

tube, and install this turbulator tube as the sixth tube in the system

See next page for an illustration of turbulator length and location.

See next page for an illustration of turbulator length and location.

GAS

TYPE

MODEL

Input x Length (ft)

TURBULATOR

LENGTH

TURBULATOR LOCATION

IN TUBE SYSTEM

NG or LP

45,000 x 20

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

60,000 x 20

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

60,000 x 30 *

8' (2.4 m) *

VENT END - REMOVE 5’ TURBULATOR 2nd TUBE

NG or LP

80,000 x 20

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

80,000 x 30 *

8' (2.4 m) *

VENT END - REMOVE 5’ TURBULATOR 2nd TUBE

NG or LP

80,000 x 40

10’ (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG ONLY

100,000 x 20

8’ (2.4 m)

S/S

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

110,000 x 30

13' (4 m) S/S

VENT END - FACTORY INSTALLED IN TUBES

NG or LP

110,000 x 40

12' (3.6 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

110,000 x 50 **

2' (0.6 m) **

2’ FACTORY INSTALLED IN 3rd TUBE

NG or LP

125,000 x 30

13' (4 m) S/S

VENT END - FACTORY INSTALLED IN TUBES

NG or LP

125,000 x 40

12' (3.6 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

125,000 x 50 **

2' (0.6 m) **

2’ FACTORY INSTALLED IN 3rd TUBE

NG or LP

150,000 x 40

12' (3.6 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

150,000 x 50 **

2’ (0.6 m) **

2’ FACTORY INSTALLED IN 3rd TUBE

NG or LP

150,000 x 60 **

2' (0.6 m) **

2’ FACTORY INSTALLED IN 3rd TUBE

NG or LP

175,000 x 50/60

10’ (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG Only

175,000 x 70

10’ (3 m)

6th tube = 50 to 60 ft

NG Only

200,000 x 50

10’ (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

200,000

x

60/70 ***

6’ (2 m) ***

Remove 4 ft: 6th tube = 50 to 60 ft

Advertising
This manual is related to the following products: