Schwank builderSchwank S100U User Manual

Page 51

Advertising
background image

51

S100-F / ITB-F I&O Manual

IM101230

RD: SEP 2014

RL: 11A

NG or LP

S100 / ITB 130-15U

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

S100 / ITB 130-20U

10' (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

S100 / ITB 155-20U *

2' (0.6 m)

FIELD INSTALLED AT END 3RD TUBE

+ 10' (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

S100 / ITB 155-30U

not required

-

NG or LP

S100 / ITB 175-30U

10’ (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

S100 / ITB 200-30U

6’ (2 m)**

VENT END - Remove Short Piece from Tube

GAS

TYPE

MODEL

TURBULATOR

LENGTH

TURBULATOR LOCATION
IN TUBE SYSTEM

NG or LP

S100 / ITB 60-10U

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

S100 / ITB 80-10U

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

S100 / ITB 80-15U

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

S100 / ITB 110-15U

14' (4.3 m)

VENT END - FACTORY INSTALLED IN TUBE

NG or LP

S100 / ITB 110-20U

10' (3 m)

VENT END - FACTORY INSTALLED IN TUBE

NOTE: Improper location of a turbulator can cause malfunction of the heater,
property damage, and will void the heater warranty.

Tube Kits are supplied with 4 ft & 10 ft turbulator(s) factory installed into the
tube(s). Tubes with turbulators are clearly labeled for easy identification. The
155-20’U model requires a 2 ft turbulator be installed in the field (see * below),

and the 200-30’U model requires removal of a short turbulator piece in the field (see ** below).

25B. TURBULATOR LENGTH & LOCATION IN SYSTEM: S100U / ITBU - ’U’- Tube

* 155 Models (150,000 Btuh): 2 ft turbulator is supplied in the Burner Kit and is field installed:



20 ft ‘U’ heater: Insert in end of third tube in system (1st tube after turn box), prior to the
10 ft turbulator that is factory installed in the last tube (total 12 ft turbulator)



30 ft U heater: Discard 2 ft turbulator - not required.

** 200 x 30 ft ‘U’: Remove 4 ft piece of turbulator from upstream end of last tube

Advertising
This manual is related to the following products: