Requirements for installation
When using
4. Do not remodel
•
The remodeling act causes the break-down.
Please never do.
5. Install the unit on a level area.
•
Do not installation the unit on a non level
surface. This will cause hazards to the
operator and create problems during actual
operation.
6. After installed, you should:
•
It may cause injure to a person if this unit falls down or moves by the earthquake and the
impact, etc..
•
To prevent, take measures that the unit cannot fall down.
7. When you use the liquid and cooling water:
•
Do not use the liquid with the explosion and toxicity.
•
Do not let cooling flow to the cooling coil when working at high temperatures.
•
Do not mix water when you use oil in the reservoir.