Chapter 3 - installation and wiring, Installation and wiring, Chapter 3 – Rockwell Automation 160 DEVICENET (DN1) MODULE FRN 1-2.XX User Manual
Page 16

Publication 0160-5.5 - September 1997
Chapter
3
Installation and Wiring
This chapter contains information necessary to:
•
Meet the requirements of the EMC and Low Voltage directives
for CE compliance.
•
Remove a preinstalled Program Keypad Module or Ready/Fault
Indicating Panel.
•
Configure the Communication Module.
•
Install the DeviceNet Communication Module.
•
Wire the DeviceNet communication cables.
•
Remove the DeviceNet Communication Module from the drive.
Read this chapter completely before you attempt to install or config-
ure your Communication Module. Before you apply power, review
the Attention statements on page P-3 and P-4 in the Preface and
ensure that all connections are secure and that all selections are cor-
rect.
!
ATTENTION: When you make changes to the switch
settings, use a pointed instrument such as a ball point
pen. Do not use a pencil because damage may occur.
!
ATTENTION: Unpredictable operation may occur if
you fail to check connections and DIP switch settings
for compatibility with your application. Unpredictable
operation may result in personal injury, death, and
equipment damage.