Start-Up

Chapter 7

7-45

o

3.

Assure that preliminary adjustment of the following items has been
performed:

- Potentiometer adjustments as described in Chapter 5.

- S1, S2 and SW1 switch settings as described in Chapter 5.

Important: The above adjustments must be performed before
proceeding.

o

4.

Assure that the controller circuit breaker (MCB) OFF.

o

5.

Apply power to the transformer, but Do Not enable the controller or
energize the line/DB contactor (M).

o

6.

Using a voltmeter, verify that the voltages listed below are present at
the locations shown. The tolerance for all voltages is

±

10%. Clear

faults before replacing any blown fuses.

Location

Voltage

TB5-4 to TB5-5

230V AC

TB5-4 to TB5-6

230V AC

TB5-5 to TB5-6

230V AC

TB4-19 to TB4-20

18V AC

TB4-21 to TB4-20

18V AC

TB4-21 to TB4-19

36V AC

TP13 to TP12

+12V DC

TP14 to TP12

–12V DC

o

7.

Remove all power to the transformer.

o

8.

The wires connected to terminals 9 and 10 of TB2 must be marked
and removed to allow for local operation of the Enable circuit.
Connect a suitable temporary switch between these terminals and
insulate the switch connections. See Figure 7.1.

Figure 7.1
Local Control Connections

Temporary

Local Enable

Switch

Variable
Command
Input

Battery

Box

1391B-ES

Controller

TB2-1

TB2-2

TB2-9

TB2-10

+