6 ArmorBlock MaXum I/O Cable Bases Series B
Publication 1792D-IN009B-EN-P - September 2000
Package Contents for 1792D-CBFM
Your package contains:
• 1 ArmorBlock cable base
• 1 seal block with hardware
• 2 end caps
• installation instructions
(Please note: Modules are ordered and shipped separately.)
Install Your ArmorBlock MaXum 1792D-CBFM
To install the cable base:
• Mount the cable base
• Prepare the flat media cables
• Attach the flat media cables
• Attach the seal block
• Attach the module to the base
These steps are described in more detail in the following
sections.