Initial desktop setup, Step 1, Step 2 – Rockwell Automation 2706-DXX Dataliner Message Display DL5 Series User Manual

Page 16

Advertising
background image

2706-UM001A-US-P

2-2

Getting Started

Initial Desktop Setup

To setup the DL5, perform the following steps:

Step 1

Connect DC power to the DC line terminals (TB2) on the back of the DL5.

Note: The input voltage must be between 12 and 24 volts DC.

The terminals are labeled as shown below.

For additional power supply requirements refer to the specifications listed
in Chapter 14.

DC Line Terminals , Configure/Serial Trigger Switch

Step 2

Make sure the Serial Trigger / Configure switch is set to Configure (down).

To avoid system ground loops, the same power supply must
be used for the parallel port and the power input for the DL5.

ATTENTION:

!

COMMON

12-24V DC

Switch 1 (SW-1)
Enables Serial Trigger / Configure
UP = Serial Trigger

1

2

DOWN

1

2

UP

Not Used

Serial Trigger
Not Used

DOWN = Configure

1 2

D0

D1

D2

D3

D4

D5

D6

D7

D8

D9

D1
0

D1
1

D1
2

D1
3

D1
4

D1
5

PD

TB1

TB2

Configure

1 2

RS-232

SW1

PARALLEL PORT 5-24 VDC INPUT

TB2

1 COM

SW1

2 12-24V DC Input

1 Serial Trigger/ Configure
2 Not Used

Advertising