Initial desktop setup, Step 1, Step 2 – Rockwell Automation 2706-DXX Dataliner Message Display DL5 Series User Manual
Page 16

2706-UM001A-US-P
2-2
Getting Started
Initial Desktop Setup
To setup the DL5, perform the following steps:
Step 1
Connect DC power to the DC line terminals (TB2) on the back of the DL5.
Note: The input voltage must be between 12 and 24 volts DC.
The terminals are labeled as shown below.
For additional power supply requirements refer to the specifications listed
in Chapter 14.
DC Line Terminals , Configure/Serial Trigger Switch
Step 2
Make sure the Serial Trigger / Configure switch is set to Configure (down).
To avoid system ground loops, the same power supply must
be used for the parallel port and the power input for the DL5.
ATTENTION:
!
COMMON
12-24V DC
Switch 1 (SW-1)
Enables Serial Trigger / Configure
UP = Serial Trigger
1
2
DOWN
1
2
UP
Not Used
Serial Trigger
Not Used
DOWN = Configure
1 2
D0
D1
D2
D3
D4
D5
D6
D7
D8
D9
D1
0
D1
1
D1
2
D1
3
D1
4
D1
5
PD
TB1
TB2
Configure
1 2
RS-232
SW1
PARALLEL PORT 5-24 VDC INPUT
TB2
1 COM
SW1
2 12-24V DC Input
1 Serial Trigger/ Configure
2 Not Used