Creating a project, Times from opc source are in utc, Figure 25 controller selection – Rockwell Automation T8031 Trusted Valve Manager User Manual

Page 27: Figure 26 data source selection, Trusted, Valve manager t8031

Advertising
background image

Trusted

TM

Valve Manager T8031

Issue 2 Oct 05

PD-T8031

27

When the “OK” button is clicked, the Valve Manager will create an empty database and register it as an
ODBC data source. A confirmation dialog will then be displayed.

Figure 22 Database Creation

4.4. Creating a Project

The Valve Manager is configured to work with a particular Trusted

TM

system by defining a “Project”. A

project is created by selecting “Project | New Project” from the main menu.

Figure 23 Project Creation