Trusted, Valve manager t8031 – Rockwell Automation T8031 Trusted Valve Manager User Manual

Page 46

Advertising
background image

Trusted

TM

Valve Manager T8031

Issue 2 Oct 05

PD-T8031

46

The overall “Result” field for the test and the individual “Result” fields in the transition time table will turn
red when a failure is being reported. Additionally, the text below the overall “Result” field will describe
the type of failure.

Figure 48 Valve Test Failure

Advertising