Trusted, Valve manager t8031 – Rockwell Automation T8031 Trusted Valve Manager User Manual
Page 46
Advertising
![background image](/manuals/581299/46/background.png)
Trusted
TM
Valve Manager T8031
Issue 2 Oct 05
PD-T8031
46
The overall “Result” field for the test and the individual “Result” fields in the transition time table will turn
red when a failure is being reported. Additionally, the text below the overall “Result” field will describe
the type of failure.
Figure 48 Valve Test Failure
Advertising